标准编号:ISO/ASME 14414:2015
中文名称:泵系统能量评估
英文名称:Pump system energy assessment
发布日期:2015-04
标准范围
This International Standard sets the requirements for conducting and reporting the results of a pumpingsystem energy assessment (hereafter referenced as “assessment”) that considers the entire pumpingsystem, from energy inputs to the work performed as the result of these inputs.The objective of a pumping system energy assessment is to determine the current energy consumptionof an existing system and identify ways to improve system efficiency.These requirements consist of— organizing and conducting an assessment,— analysing the data from the assessment, and— reporting and documenting assessment findings.This International Standard is designed to be applied, to open and closed loop pumping systems typicallyused at industrial, institutional, commercial, and municipal facilities, when requested.This International Standard is focused on assessing electrically-driven pumping systems, which aredominant in most facilities, but is applicable with other types of drivers, such as steam turbines andengines, and drives such as belt.The International Standard does nota) specify how to design a pumping system,b) give detailed qualifications and expertise required of the person using the International Standardalthough provides a list of body of knowledge in Annex C,c) address the training or certification of persons,d) specify how to implement the recommendations developed during the assessment, but does includerequirements for an action plan,e) specify how to measure and validate the energy savings that result from implementing assessmentrecommendations,f) specify how to make measurements and how to calibrate test equipment used during the assessment,g) specify how to estimate the implementation cost or conduct financial analysis for recommendationsdeveloped during the assessment,h) specify specific steps required for safe operation of equipment during the assessment. The facilitypersonnel in charge of normal operation of the equipment are responsible for ensuring that it isoperated safely during the data collection phase of the assessment,i) address issues of intellectual property, security, confidentiality, and safety.