标准编号:ISO 27914:2017

中文名称:二氧化碳捕获、运输和地质储存 地质储存

英文名称:Carbon dioxide capture, transportation and geological storage — Geological storage

发布日期:2017-10

标准范围

This document
a) establishes requirements and recommendations for the geological storage of CO2 streams, the purpose of which is to promote commercial, safe, long-term containment of carbon dioxide in a way that minimizes risk to the environment, natural resources, and human health,
b) is applicable for both onshore and offshore geological storage within permeable and porous geological strata including hydrocarbon reservoirs where a CO2 stream is not being injected for the purpose of hydrocarbon production or for storage in association with CO2 -EOR,
c) includes activities associated with site screening and selection, characterization, design and development, operation of storage sites, and preparation for site closure,
d) recognizes that site selection and management are unique for each project and that intrinsic technical risk and uncertainty will be dealt with on a site-specific basis,
e) acknowledges that permitting and approval by regulatory authorities will be required throughout the project life cycle, including the closure period, although the permitting process is not included in this document,
f) provides requirements and recommendations for the development of management systems, community and other stakeholder engagement, risk assessment, risk management and risk communication,
g) does not apply to, modify, interpret, or supersede any national or international regulations, treaties, protocols or instruments otherwise applicable to the activities addressed in this document, and
h) does not apply to or modify any property rights or interests in the surface or the subsurface (including mineral rights), or any pre-existing commercial contract or arrangement relating to such property.
The life cycle of a CO2 geological storage project covers all aspects, periods, and stages of the project, from those that lead to the start of the project (including site screening, selection, characterization, assessment, engineering, permitting, and construction), through the start of injection and proceeding through subsequent operations until cessation of injection and culminating in the post-injection period, which includes a closure period. Figure 1 illustrates the limits of this document.