标准编号:ISO/TS 16530-2:2014

中文名称:井的完整性 第2部分:操作阶段井的完整性

英文名称:Well integrity — Part 2: Well integrity for the operational phase

发布日期:2014-08

标准范围

This Technical Specification provides requirements and methods to the oil and gas industry to managewell integrity during the well operational phase.The operational phase is considered to extend from handover of the well after construction, to handoverprior to abandonment. This represents only the period during the life cycle of the well when it is beingoperated and is illustrated in Figure 1.The scope of the Technical Specification includes:— A description of the processes required to assess and manage risk within a defined framework. Therisk assessment process also applies when deviating from this Technical Specification.— The process of managing well integrity by operating wells in compliance with operating limitsfor all well types that are defined based on exposure of risk to people, environment, assets andreputation. The management of well integrity is supported by associated maintenance/monitoringplans, technical reviews and the management of change.— The assessment of existing assets (wells / fields) in order to start the process of Well IntegrityManagement in accordance with this technical specification.— The handover process required when changing from one activity to another during the operationalphase.The scope of the Technical Specification applies to all wells that are utilized by the oil and gas industry,regardless of their age, type or location.The scope of the Technical Specification does NOT apply to:— The periods during well intervention or work-over activities but it DOES include the result of theintervention and any impact that this can have to the well envelope and the associated well barriers.— The equipment that is required or used outside the well envelope for a well intervention such aswire-line or coiled tubing or a pumping package.

标准预览图

下载信息


立即下载标准文件

大家都在看