标准编号:ISO/ASME 14414:2019

中文名称:泵系统能量评估

英文名称:Pump system energy assessment

发布日期:2019-01

标准范围

This document sets the requirements for conducting and reporting the results of a pumping system 
energy assessment (hereafter referenced as “assessment”) that considers the entire pumping system, 
from energy inputs to the work performed as the result of these inputs.
The objective of a pumping system energy assessment is to determine the current energy consumption 
of an existing system and identify ways to improve system efficiency.
These requirements consist of
— organizing and conducting an assessment,
— analysing the data from the assessment, and
— reporting and documenting assessment findings.
This document is designed to be applied, to open and closed loop pumping systems typically used at 
industrial, institutional, commercial, and municipal facilities, when requested.
This document is focused on assessing electrically-driven pumping systems, which are dominant in 
most facilities, but is also applicable with other types of drivers, such as steam turbines and engines. 
The document does not
a) specify how to design a pumping system,
b) give detailed qualifications and expertise required of the person using the International Standard 
although provides a list of body of knowledge in Annex C,
c) address the training or certification of persons,
d) specify how to implement the recommendations developed during the assessment, but does include 
requirements for an action plan,
e) specify how to measure and validate the energy savings that result from implementing assessment 
recommendations,
f) specify how to make measurements and how to calibrate test equipment used during the 
assessment,
g) specify how to estimate the implementation cost or conduct financial analysis for recommendations 
developed during the assessment,
h) specify specific steps required for safe operation of equipment during the assessment. The facility 
personnel in charge of normal operation of the equipment are responsible for ensuring that it is 
operated safely during the data collection phase of the assessment,
i) address issues of intellectual property, security, confidentiality, and safety.

标准预览图

下载信息


立即下载标准文件

大家都在看